Bored pier inspection in Werribee

Piers carry part of the house down to firmer ground, and they can only be checked while the holes are open and the steel is visible.

  • After the holes are drilled and the cages set, before concrete goes in
  • About 1 hour on site
  • Report within 24 hours
Request a Werribee quoteChoose the inspection, leave your details and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookAfter the holes are drilled and the cages set, before concrete goes in
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Werribee bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Werribee builds

Werribee sits on the western basalt plains, where clay soils are commonly reactive and some lots carry fill or deeper soft ground. Where the engineer specifies piers, their depth and steel are what the slab relies on.

What we find at this stage in Werribee

  • Holes shallower than the engineering depth
  • Cages sitting on the base without chairs
  • Loose spoil left in the bottom of a hole
  • Cover short at the sides of the cage
  • Pier position off the plan

The other stages of a Werribee build

  1. Slab pre-pour inspection in Werribee2Slab pre-pourOnce pods, steel and membrane are down, the day before concrete
  2. Frame inspection in Werribee3FrameWhen walls, trusses and roof cover are up, before any sarking or insulation hides them
  3. Lock-up (pre-plaster) inspection in Werribee4Lock-up (pre-plaster)With roof, windows, external doors and cladding on, before plasterboard
  4. Fixing inspection in Werribee5FixingWhen doors, skirtings and cabinetry are in, ahead of the painter
  5. Waterproofing inspection in Werribee6WaterproofingAfter the membrane has cured and before the tiler arrives
  6. Pre-handover (PCI) inspection in Werribee7Pre-handover (PCI)Roughly a week before the builder hands over the keys

All construction stage inspections in Werribee →

Guides

Construction stage guides for Werribee

All guides →

Book a bored piers inspection in Werribee

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Werribee: common questions

How long does a pier inspection take?

Usually under an hour for a standard Werribee lot, longer where there are many piers.

Does every Werribee build need piers?

No. Piers appear where the engineer calls for them, usually because of soil, fill or a nearby easement. Your engineering drawings will show whether they are part of your slab.

What do you measure?

Depth and diameter of each hole we can reach, the position of the steel, the chairs holding it off the base and the cover to the sides.

Can a pier problem be fixed after the pour?

Only with major work. That is why the check happens before concrete goes in.

Do you certify the piers?

No. We report what we saw against the engineering. Certification belongs to the engineer and your building surveyor.

What if the hole is full of water?

We record it and note what could not be seen. The builder should pump it out before the pour, and we can return if needed.